Control project time before cost drifts out of view

Connect approved time, cost rules, budgets, forecasts, corrections, and downstream systems in one governed project-control workflow.

Transparent project control — not employee surveillance or automatic financial judgment.

Approved timeVersioned ratesBudget & forecastControlled adjustmentsReconciled outputs

Project Time & Cost Control Center • Portfolio

Budget vs. Approved Actual vs. Forecast

● Forecast > Budget

Current Budget

$2.40M

v3 • approved

Approved Actual

$1.61M

67% consumed

Forecast @ Completion

$2.58M

+7.5% vs budget

Exceptions

6

2 provisional

Apr
May
Jun
Jul
Aug
Sep
Oct
Budget
Approved Actual
Forecast

Unapproved time · 2 records

Provisional

FX rate unavailable · EUR → USD

Blocks calc

Budget version mismatch · Phase 2

Needs review

Owner · Project Finance Reviewer

Assigned

Project, phase & cost-object views • No worker productivity ranking. Synthetic data.

Control Proof

Time and cost are related —not interchangeable

ZoikoTime keeps payable time, project effort, internal cost, billable value, budget, forecast, and reconciliation as distinct, governed measures.

Approved time

Versioned rates

Budget & forecast

Controlled adjustments

Reconciled outputs

Separate Measures

One hour is not one number

Model each measure on its own terms—with its own rules, permissions, and downstream target.

Project effort

Approved or planned time assigned to a project, phase, task, or cost code with allocation version and scope.

Internal cost

Effort transformed by an approved internal cost rule: rate type, version, currency, effective date, formula, and rounding.

Billable value

Billable quantity × approved billing rate or fee rule by contract or change order, separate from internal cost.

Budget & forecast

Approved planned limit and projected outcome by dimension and period, each versioned and owned.

One governed view — from approved time to reconciled output.

Budgets, forecasts, and variance you can explain, defend, and reconcile.

Why Cost Drifts

Where project cost quietly goes wrong

Each driver is met with a governed control — visible, versioned, and human-owned.

Rates

Rate version mismatch

Historical time gets calculated with the wrong or current rate. Fixed with effective-dated rate versions and controlled revaluation.

Currency

Currency or FX gap

Project, contract, and reporting values can't be compared. Fixed with currency roles, FX source, rate date, version, and missing-rate state.

Time

Unapproved time in actuals

Draft or disputed time overstates cost. Fixed by separating submitted, approved, corrected, and reconciled time, with provisional clearly labeled.

Scope

Variance without context

Overspend may be an approved scope change or timing. Fixed by showing budget version, scope/change order, phase, and forecast before escalation.

Allocation

Allocation overwrite

Moving hours erases the original approval. Fixed with append-only allocation adjustments preserving before/after history and authority.

Systems

Blurred system boundary

ERP or PSA stays authoritative. Fixed by showing system of record per object, mapping, freshness, and reconciliation.

The Control Model

Seven governed steps from time toreconciliation

Capture → cost rules → allocate → budget → forecast → route exceptions → close & improve.

1

Capture approved time

Reuse fair, approved time records with source, provenance, and worker-visible history.

2

Apply cost & rate rules

Transform effort with versioned, effective-dated internal cost rates, currency, and rounding—disclosed, not hidden.

3

Allocate to projects

Assign time to project, phase, task, or cost code with versioned, append-only allocations.

4

Compare to budget

Measure approved actuals against baseline budget and approved changes by dimension and period.

5

Forecast & explain variance

Project outcome vs. budget and attribute variance to scope, mix, timing, rate, or data quality.

6

Route exceptions

Send unapproved time, missing rates, or budget mismatches to the authorized owner—never auto-judged.

7

Close & improve

Lock periods, preserve evidence, handle late entries, and analyze recurring causes.

Roles

Proof for every buyer, on their terms

Illustrative imagery of the teams this serves—finance, delivery, and operations.

Finance & Project Accounting

Finance & Project Accounting

Versioned rates, budgets, forecasts, variance, and reconciliation evidence.

Delivery & PS Operations

Delivery & PS Operations

Budget consumption, forecast, and exceptions by project, phase, and cost object.

Ops, Payroll & Procurement

Ops, Payroll & Procurement

Approved time and outputs that connect to payroll, billing, and ledgers while remaining separate.

Imagery is illustrative — photos from Unsplash, not depictions of specific ZoikoTime customers.

Rate Governance

Sensitive rates, controlled by design

Separate rate types with effective dates, scope, currency, access control, and calculation disclosure—compensation stays restricted.

Rate & Cost-Rule Governance

Effective-dated · Versioned
Rate TypeScopeVersionVisibility
Internal cost rateSenior Eng · USDv4 · Jan 1Finance only
Billing rateContract A · USDv2Commercial only
Pay / contractor refRestrictedCompensation hidden
FX ruleEUR → USDv7 · dailyMissing → blocks calc
Historical records keep the rate version used at calculation time. Sensitive rates are enforced server-side and excluded from unauthorized exports.

Versioned, scoped, sensitive rate control

Internal cost, billing, contractor, blended, FX, and rounding rules are modeled separately. Every rule is versioned and effective-dated so historical calculations always retain the correct version while sensitive values remain protected server-side.

Separate internal cost vs. billing rate

Effective-dated versions — no silent overwrite

Compensation restricted & excluded from exports

Budget & Forecast

Explain variance before you escalate it

Baseline, approved changes, current budget, forecast versions, and variance categories—with the reason and the owner of the next action.

Approved baselines,
forecast & variance evidence

See what changed, why, what is provisional, and who owns the next action. Variance is attributed to scope, mix, timing, rate, or data quality—not misconduct.

Versioned baseline, changes & current budget

Forecast at completion vs. approved budget

Variance reasons & a named owner

Budget, Forecast & Variance

Forecast > Budget
What changed
Forecast at completion is +7.5% above the current approved budget.
Why
Approved scope change, role mix, late approved time, and rate version update.
What is provisional
2 time records and 1 FX rate are unapproved or unavailable.
Baseline → Current
$2.20M → $2.40M (v3, approved changes)
Who owns next action
Project Finance Reviewer — review forecast and rate status.
Variance is explained with scope and context before any escalation—never treated as misconduct.

Reconciliation

Cost, billing, payroll & ledger —separate and traceable

Approved outputs connect to downstream systems with their own statuses. A correction in one never silently changes another.

Downstream Reconciliation

Targets Kept Separate
TargetVersionAckState
Payroll inputv318:30Reconciled
Billing / Invoicev318:31Accepted
Project Ledger (ERP)v3Mismatch · Retry
Accounting ClosePeriod Soft-Locked
Payroll, billing, ledger, and accounting close remain independent states. A payroll correction never silently changes a client invoice.

Keep every downstream target independent

Each target—payroll, billing, project ledger, and accounting—has its own transmitted version, acknowledgment, and reconciliation state. ZoikoTime reconciles; it does not replace your accounting, payroll, billing, or ERP systems.

System-of-record shown per object

Transmission, acknowledgment & reconciliation

No cross-contamination between targets

Complete States

No ambiguous status — ever

Time, budget, and period states are explicit throughout the entire lifecycle.

DraftProvisionalSubmittedApprovedCorrectedExportedReconciledSoft-lockedHard-lockedAdjustment-onlyReopenedArchived

Period lock, project closure, billing, payroll, and accounting close are separate states. Late entries route through a governed adjustment or an authorized reopen process.

Financial control — never worker surveillance.

Project, phase & cost-object views. No productivity ranking. No automatic financial judgment.

Trust, Privacy & Security

Control cost without watching people

The interface defaults to project, phase, team, and cost-object views. It never ranks individuals by productivity or treats variance as misconduct.

Anti-surveillance Invariant

No screenshots, keystroke content, URL history, application-name monitoring, or clipboard collection under any tier or configuration.

Human authority remains controlling. ZoikoTime does not replace accounting, payroll, billing, ERP, or statutory financial systems, and makes no automatic profitability, tax, or compliance judgment. Rates, currencies, integrations, and availability are registry-controlled and labeled Needs setup, Requires integration, or Planned where applicable.

Visit Trust Center →

Questions

Project time & cost — answered